Grouping of 12 proposed projects for FDOT District 6, Miami Beach and Miami, FL
This Five year grouping of projects entailed blasting and coating structural steel structures, cathodic protection through pile jackets, full deck replacement and partial deck replacement utilizing hydro blasting to provide a uniform deck surface, spall repair, repair and recondition existing bascule bridge machinery, fender system repairs, crack injection, and navigational lighting.