FM #24994115201/24994155201:
SR 823 (57th Ave) from 23rd St to 53rd St. $40 Million dollar grouping that is composed of total reconstruction of SR 823 / NW 57th Ave., a six lane divided roadway that includes milling & resurfacing, drainage modifications, guardrail, signing, pavement markings, signalization, bridge widening, channel excavation, sheet piling, pile driving and landscaping on NW 57th Ave., from W. 23rd Street to W. 46th St. and W 46th Street. to W 53rd St. The Grouping included three JPA’s, two with Miami Dade Water and Sewer and one with the City of Hialeah and also had two Cost Saving Initiatives that had a total savings of over $2.8 Million Dollars. The Project also won a Davis Productivity award.
9/2011 to 2/2016