SR 826/SR 836 Interchange Design Build Finance
Miami-Dade County, Florida-FDOT District 6
580-million-dollar project that includes the design and construction of 46 bridges with over four million cubic yards of embankment with complex MOT and traffic shifts. The 46 bridges consist of 32 Florida I-Beam Category 1 bridges and 14 Florida I-Beam and Steel Category 2 bridges (including four segmental bridges). The project scope includes 4 million cy of embankment, 1 million cy of subsoil (Muck) removal, relocation of North Line Canal to just east of SR 826 running through the entire length (N-S) of the project. 30 miles of concrete pile length, 16 miles of drainage pipe, 8,636 tons of reinforcing steel, 180,000 tons of asphalt, 16 miles of bridge beams, 760,000 square feet of retaining wall, 35,000 linear feet of guardrail, and 5.7 miles of concrete median wall separating traffic lanes.
9/2009 to 6/2016