FM#24961436201:
CEI services for SR 997 Krome Ave from S of SR-94 (Kendall Dr) to N of SR-90 (SW 8th St)
$74 Million dollar A+B project that is composed of a adding lanes and reconstruction of over 6 miles of Krome Ave. and included bridge widening. The Improvements under this Contract consist of reconstruction and widening of Krome Avenue from a two-lane undivided rural arterial to a four-lane divided rural arterial roadway from south of Kendal drive to north of SW 8th street, minimizing R/W acquisition and meeting the current FDOT design criteria. The Scope of work includes signing and pavement markings, drainage, signalization and a proposed typical section that provides two 12-foot lanes in each direction separated by a 40-foot grass median. An 8-foot inside shoulder (2 ft paved) is provided for both bounds. A 12-foot outside shoulder is (5 ft paved) with guardrail is provided along the northbound.
2/2015 to 4/2018