E17-DTPW-01:
Miami-Dade County CEI for Various Projects
Projects scheduled or completed are:
WO-01 – Project 20190275 Work includes construction of new sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs and/or gutters; reconstruction and/or repair of existing sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs and/or gutters; removal and disposal of various existing pavements, trees, tree roots and debris; grading and preparation of subgrade and sodding; and adjustment of existing utility valve covers to new finished grade. The location of work:
1. SW 154 Ave from SW 80 St to SW 81 Circle Lane (include 15401 SW 81 Circle Ln) 2. Campo Rd from Country Walk Dr to SW 145 Ter 3. SW 78 St to SW Kendall Lakes Blvd (theoretical SW 82 St) from SW 145 Ave to SW 142 Ave around Kendall Lakes Park 4. SW 149 Ave from SW 88 St to SW 92 Terr. 5. SW 139 Ave from SW 32 St to SW 34 St 6. SW 153 Pl from SW 8 St to SW 10 St 7. SW 149 Ave from SW 71 St to SW 72 St 8. SW 112 St from SW 154 Ave to SW 157 Ave 9. SW 147 Pl from SW 70 Ter to SW 148 Ave (including 6898 SW 147 Place).
WO-07 – Project 20180268 Work includes construction of new sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs and/or gutters; reconstruction and/or repair of existing sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs and/or gutters; removal and disposal of various existing pavements, trees, tree roots and debris; grading and preparation of subgrade and sodding; and adjustment of existing utility valve covers to new finished grade. The location of work to be performed under the terms of this Contract shall be as follows: 1. NW 47th Ave. from NW 167th St. to NW 183rd St. (Miami Garden Dr.) 2. NW 46TH St. from NW 27th Ave. to NW 37th Ave. 3. N. Miami Ave. from N. 119th St. to N. 135th St. 4. NW 7th St. from West of Tamiami Canal Rd. to SW 72nd Ave. 5. SW 56th St. from Palmetto Xpwy to 8000 Blk. 6. SW 120th St. from SW 122nd Ave. to SW 137th Ave. (South Side) 7. NW 43rd Terr. from NW 29th Ave. to NW 31th Ave. 8. SW 187th Ave. from SW 344th St. to SW 352nd St. (West Side) 9. SW 92nd Ave. from SW 150th St. to SW 152nd St. 10. NE 17th St. from North Miami Ave. to NE 1th Ave. 11. SW 160th St. from SW 137th Ave. to SW 147th Ct. (Blocks W/ Bus Stops).
WO-08 – Project 20180276 Work includes construction of new sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs and/or gutters; reconstruction and/or repair of existing sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs and/or gutters; removal and disposal of various existing pavements, trees, tree roots and debris; grading and preparation of subgrade and sodding; and adjustment of existing utility valve covers to new finished grade. Various locations.
WO-12 - Project 20190120 Work includes but is not limited to the following: Milling and resurfacing, widening and resurfacing of intersecting streets, up to the existing joint at the side street or up to the point of curvature as determined by the Engineer or as indicated in the Plans, resurfacing of asphaltic pathways (pedestrian, bicycle, etc.) adjacent or not to the edge of pavement as necessary, temporary utility repairs (cold patches), clearing and excavating of shoulder areas or build-up, as directed by the Engineer; grading and clean-up of adjacent shoulders and removal of roots, as required, pavement markings including the installation of reflective pavement markers (blue/blue) at fire hydrant locations, sidewalk, sidewalk curbs and connectors, and pedestrian ramps. Location of Work 1- Ives Dairy Rd from NE 2 Ave to I-95 2-SW 184 St between Old Cutler Rd and Franjo Rd 3-SW 127 Ave from SW 200 St to SW 216 St 4-SW 248 St from SW 87 Ave to SW 97 Ave 5-SW 117 Ave from SW 56 St to SW 72 St 6-W 17 Ave from NW 7 St to Miami River Bridge 7-W 17 Ave from Miami River Bridge to NW 20th. St.
12/2019 to 11/2023