FIN 444444-2-52-01. This Project, undertaken in partnership with National Park Services (NPS), FDOT and FHWA, is the largest ecological restoration project in the Continental US. This Project is made up of 3 Segments between SFWMD Structure S-333 at the western limits and east of Structure S-334 as the eastern limits for 11 gross mi. less the 2 completed projects (TTP1 and 1 mi Bridge) for 7 mi approx. The project includes the reconstruction of the existing two-lane roadway and shoulders; realigning and raising the profile of the existing roadway approximately two feet, placement of geosynthetic reinforcements for roadway and base reinforcement, utility coordination, construction of 7 drainage culvert crossings, 6 bridges of 60’ span each, construction of drainage swales and harmonizing the proposed roadway to adjacent properties and SFWMD canals within the project limits.